A house with a performance hall in Otsu
|
Planning
conditions
|
|
|
| Planned site |
|
Otsu City |
| Purpose |
|
Newly built detached house |
| Construction period |
|
5 months |
| floor area |
|
Approximately 135m2 |
| Construction period |
|
2002/07~2003/01 |
| Architect |
|
A married couple who are
professional classical musicians.
|
Design and supervision
site management staff
|
|
Tsukahara Architectural
Design Office
090-7344-9652
1-6-8-205
Enokojima, Nishi-ku, Osaka
550-0006 Japan
tkhr96@k8.dion.ne.jp
|
| Architectural design |
|
Hidenori Tsukahara and
Fumi Hashino
|
| construction |
|
Azusa Construction Co., Ltd. |
|
|
On-site supervisor, Construction
Department, Jun Fukada |
| Architectural main vision |
|
Performance hall, second-floor
seating, wooden structure, open atrium. |
|
|
Eco-friendly materials,
solar power generation, low cost |
|
|
|
| Designer's proposal |
|
A performance hall
with a runway (staircase). |
|
|
Building exterior that harmonizes
with the road (slope) in front
of the building |