A house with a performance hall in Otsu

Planning
conditions

Planned site Otsu City
Purpose Newly built detached house
Construction period 5 months
floor area Approximately 135m2
Construction period 2002/07~2003/01
Architect A married couple who are
professional classical musicians.


Design and supervision
site management staff

Tsukahara Architectural
Design Office

090-7344-9652
1-6-8-205
Enokojima, Nishi-ku, Osaka
550-0006 Japan

tkhr96@k8.dion.ne.jp

Architectural design Hidenori Tsukahara and
Fumi Hashino


construction Azusa Construction Co., Ltd.
On-site supervisor, Construction
Department, Jun Fukada
Architectural main vision Performance hall, second-floor
seating, wooden structure, open atrium.
Eco-friendly materials,
solar power generation, low cost
Designer's proposal A performance hall
with a runway (staircase).
Building exterior that harmonizes
with the road (slope) in front
of the building

Sitemap
Works
Process

About us
Otsu-M
with a Hall

Photos
CG
Record

Model
Handcutting
Enjoy CG



コートハウス(中庭住宅)は実績豊富な大阪の建築家 塚原建築設計室にご相談下さい
塚原建築設計室 公式 日本 建築家 大阪 住宅設計 一級建築士事務所
注文住宅は実績豊富な大阪の建築家 塚原秀典 塚原建築設計室にご相談下さい
大阪 高級食パン 三景屋 みかげや 熟成
Home
Works
Process
About us
Google  Yahoo

アクセスカウンター