A. Areas of business experience:
 
Kinki, Chubu, Kanto, and Tohoku regions
B. Businesscontent
Our work involves the design and supervision of residential buildings, commercial buildings, production and logistics facilities, etc.
We have a particularly large number of achievements in Courtyard housed. 



Sitemap
Works
Process

About us
Courtyard
Mixed-Use
Renovation
Unique
Shop
Project

Logistics
Architect-Created Space Design /
Design Process
C. Careful work progress through step-by-step
  drawing creation.
We explain the work process in the order of the drawings created, and strive for careful and thorough work execution.

1.Project plan diagram
These drawings are used by the client and architect to confirm their mutual wishes before a design contract is signed . Multiple proposals may be submitted. This is the same as the initial proposal example on a separate page .



2.Basic design drawings
After the design and supervision contract is signed, these drawings include site plans, floor plans, elevations, sections , and finish schedules . A large volume of CG renderings and image models are created around this time.



3. Estimated Cost Diagram
Before moving on to detailed design, we create preliminary construction cost drawings and verify that the estimates match the building owner's budget.



4. Detailed design drawings
Once you are satisfied with the estimated construction costs and basic design, we will proceed to the detailed design phase. We will then create drawings for the final construction cost estimate for the architectural, structural, and equipment aspects.



5.Application drawing for confirmation
Once we have a clear indication that the construction costs will stay within budget, we will prepare and submit the application drawings to the relevant government agencies.



6. Construction contract diagram
v After the estimate is provided, design changes may be necessary to keep the construction costs within budget. Drawing revisions may also be required during the building permit application process due to instructions from government offices, etc. All of these revisions are made before the final construction contract drawings are compiled.



7. Construction drawings
At the start of construction, the contractor will create more detailed drawings than those in the construction contract, and the supervisor will check these drawings.




8. As-built drawings
After construction is complete, any discrepancies from the contract drawings are corrected, and construction drawings created during the project are added to create the final completion drawings. These completion drawings should be carefully stored for future renovations and repairs.

D. Architectural fees (see separate page)



Sitemap
Voices
Media
Bidding
Youtube
Kitchen

Link



コートハウス(中庭住宅)は実績豊富な大阪の建築家 塚原建築設計室にご相談下さい
塚原建築設計室 公式 日本 建築家 大阪 住宅設計 一級建築士事務所
注文住宅は実績豊富な大阪の建築家 塚原秀典 塚原建築設計室にご相談下さい
大阪 高級食パン 三景屋 みかげや 熟成
Home
Works
Process
About us
Google  Yahoo

アクセスカウンター