Enjoy life in a 40-tatami mat space,
including the courtyard.
|
Planning
conditions
|
|
|
| Planned site |
|
Sakai City |
| Zoning |
|
Second-class medium-to-high-rise residential zone |
|
|
Fire prevention Article 22 designation |
| Site area |
|
165m² |
| Purpose |
|
Newly built detached house |
Construction
period |
|
4 months |
| floor area |
|
Approximately 105m2 |
Number of
floors and
structure |
|
Two-story wooden building
above ground |
Family
composition |
|
family of 4
|
Design
conditions |
|
① Courthouse |
|
|
② Minimize openings in the exterior wallsfacing the road and neighboring
properties.Install many bright and open windows inthe interior outdoor
courtyard.
|
|
|
③ Two Western-style rooms
(one of which can be divided in the future) |
|
|
④ Installation of an open atrium space |
|
|
⑤ Doors, flooring, etc. will be standardproducts from the manufacturer. |
|
|
⑥ Installation of underfloor heating
|
Design and
supervision
site
management
|
|
Tsukahara Architectural
Design Office
090-7344-9652
1-6-8-205 Enokojima,
Nishi- ku ,
Osaka 550-0006 Japan
tkhr96@k8.dion.ne.jp
|
| construction |
|
Act Co., Ltd.
072-361-1169
2392 Hirao, Mihara-ku,
Sakai City,
Osaka Prefecture
|
Roof
finishing |
|
Galvalume steel sheet standing
seam roofing |
| outer wall |
|
Ceramic siding (Panasonic) |
Living
room
ceiling |
|
Gypsum board base +
vinyl wallpaper |
living room
wall |
|
Gypsum board base +
vinyl wallpaper |
living room
floor |
 |
Flooring compatible with
underfloor heating (Panasonic) |