This is the building before it was rebuilt. I posted it
as a memento.
Before demolition, we will set aside
memorable materials such as the floor pillars of the
Japanese-style room.


May 22nd The ground-breaking ceremony was
successfully completed under clear skies.



June 18th There was a short delay between the
ground-breaking ceremony and the start of
construction.
In some places, the ground was
excavated to a depth of nearly 2 meters from the
road surface for ground improvement.



June 22nd Ground improvement was completed and
a load test was conducted.



June 22nd Ground improvement was completed and
a load test was conducted.

A load of 1.4 tons was applied to a 300 mm diameter
slab.
In other words, the load-bearing capacity of the
ground was confirmed to be 19 t/m2.


June 23rd A regular meeting was held with the client.
The progress of the construction so far was reported.

June 24th After the load test, lean concrete was
poured
and I was present for the marking work to
determine the building's position.



June 30th Rebar inspection was conducted
A rebar inspection was conducted by the designer,
structural designer, and housing guarantee
organization.


June 30th: Rebar inspection conducted.
The structural designer has issued instructions for
corrections to the rebar placement around the column foundations as follows.







It will get hotter as July begins tomorrow, but we
hope that the construction will proceed smoothly.
July 5th:
Formwork construction completed .
Inspection contents include the concrete cover
thickness around the rebar.




July 5th:  Column size confirmation.



July 5th: Confirmation of underground beam height
and beam width is also important.




July 6th: Concrete pouring work carried out from the
morning. July 6th:




Concrete pouring completed.


July 12th: Steel frame inspection.
The dimensions and welding status of the steel frame are checked at the factory before assembly on site.


July 17th: Erection completed.
The general erection is complete. After this, bolts

will be tightened to improve the accuracy of vertical
and horizontal alignment. 


July 21st: Bolt final tightening test.
Each bolt is marked with chalk to confirm that the
bolt moves by approximately the same amount during the initial tightening and final tightening. This
confirms that the force is applied evenly to the bolts.






July 22nd:
Laying down steel plates (QL deck) to form the base
of the concrete deck floor.

Simultaneously, work is being done on the finer steel
frame substructure.



August 4th: Deck plates and mesh reinforcement
are installed. The
legally required intermediate
inspection is also completed on the same day.







August 18th: Interior finishing
consultation. Samples are presented to the client,
and discussions about the interior begin.


As construction progresses,
we visit showrooms to look at kitchens and
unit bathrooms.



September 8th: Installation of large ALC panels
is almost complete.



September 13th: Comparison of exterior wall finish
colors .
One color will be selected from these,
a larger color sample will be created, and
the client's
approval will be sought.



September 13th:
Lots of light streams in from the two gardens
on the east side.

Preparations for wiring have begun on site.






October 16th: Partitioning work has begun.
What you see in the foreground is the base for
the kitchen counter.




Looking up at the open space above the dining area.


October 23rd: The difference in floor levels in the
first-floor entrance
hall is gradually giving the entrance a clearer image.


The subfloor work for the second floor is almost
complete.
40mm thick cedar planks will be laid on
top of this.



November 6th:
Board subfloor work is underway for the open space
above the dining room.



November 13th:
Board subfloor work for the open space above the
dining room is complete.



November 18th:
Exterior wall painting is complete. A simple white
finish creates an elegant look.



November 20th:
The entrance is also nearing completion.
Orange diatomaceous earth is used as an accent
on the right side.
Tiles will be laid on the floor next.


Sitemap
Works
Process

About us
Courtyard
house24

Photos
CG
Record

Model
Plan
Enjoy CG




コートハウス(中庭住宅)は実績豊富な大阪の建築家 塚原建築設計室にご相談下さい
塚原建築設計室 公式 日本 建築家 大阪 住宅設計 一級建築士事務所
注文住宅は実績豊富な大阪の建築家 塚原秀典 塚原建築設計室にご相談下さい
大阪 高級食パン 三景屋 みかげや 熟成
Home
Works
Process
About us
Google  Yahoo  x

アクセスカウンター