Groundbreaking ceremony


Columnar soil improvement


Earthwork completed


Foundation reinforcement


Foundation concrete pouring


1st floor, wall reinforcement


1st floor, road-side outer formwork





2nd floor, south side  floor and beam reinforcement inspection


2nd floor, north side floor and beam reinforcement inspection


2nd floor, floor and beam concrete pouring


2nd floor ,floor and beam concrete pouring





Steel staircase delivered
It's a very impressive staircase


Check for levelness


2nd floor, wall and column reinforcement inspection





R floor, reinforcement inspection


1st floor, formwork removal











2nd floor, formwork removal also completed


Substrate work begins before painting work





sash work has also begun


Rooftop floor waterproofing Substrate work completed


Glass work and mortar filling around sashes completed


This time it's a painted finish, not exposed concrete. lso, instead of a sharp corner finish, the corners were repaired with plastering work.


Wiring work begins, at this stage the client confirms the location of the electrical box.








June: 1st floor subfloor construction begins.


1st floor: Exterior wall spray insulation installation.


2nd floor : Spray insulation installation.


1st floor: Spray insulation installation & subfloor construction.


1st floor: Exterior wall insulation installation, including the ground floor area.


2nd floor: Spray insulation installation & subfloor construction.


Spray insulation installation thickness check: Toothpicks marked at 30mm are inserted.


Exterior staircase waterproofing undercoat construction.


Ceiling and wall undercoat construction begins.


Ceiling and wall undercoat construction begins.


Ceiling and wall undercoat construction begins.


Northeast side eaves painting completed.


East side 1st floor wall painting completed.


East side 1st floor wall painting completed.


North side roof balcony exterior wall painting completed.


Outdoor staircase painting completed.


Rooftop area painting completed.


Rooftop area painting completed.


Scaffolding removed


Waterproofing paint applied to parts of the exterior that will be partially buried in the soil.


1st floor undercoat boards are almost finished.


Clean stair treads have been prepared separately.


The item in the middle is a washbasin.


2nd floor private rooms also have undercoat boards installed (2022/7/29).











Wallpapering has progressed considerably.








System kitchen installation work,


stair tread installation.




Please see the completed photos from here on.


Sitemap
Works
Process

About us
Osaka I
Photos
CG
Record

Model

Enjoy CG



コートハウス(中庭住宅)は実績豊富な大阪の建築家 塚原建築設計室にご相談下さい
塚原建築設計室 公式 日本 建築家 大阪 住宅設計 一級建築士事務所
注文住宅は実績豊富な大阪の建築家 塚原秀典 塚原建築設計室にご相談下さい
大阪 高級食パン 三景屋 みかげや 熟成
Home
Works
Process
About us
Google  Yahoo

アクセスカウンター