October 22nd Groundbreaking ceremony successfully completed

Ground improvement work

Underground beam reinforcement work Underground

beam reinforcement inspection

Steel frame erection completed

Installation of insulation material under the floor concrete

Floor concrete reinforcement work

2nd floor deck slab reinforcement work


Floor concrete pouring completed

Interior wall base work


Installation of insulation material in the ceiling

Squash court walls Interior insulation material and soundproofing material
installation A specification was to prevent the sounds generated by squash
and fitness from going outside

An experiment was conducted in advance using the above box to see if the
soundproofing conditions were met.The result was that even when the volume
was loud enough to damage the amplifier,there was no sound leakage to the
outside

Squash court interior wall covering work

Steel painting work started

Steel painting work


Back wall glass door handle installation.A specification was that there
should be no handle protrusions on the inside and that it should be easy
to lock from both the inside and outside

Court upon completion
Thanks to the cooperation of many people involved, the construction was
completed successfully.Thank you very much.
|
|
|
|
 |