Note 1)
In the case of reinforced concrete construction, the effort required for
on-site supervision isThe price will increase considerably, so it will
be 1.2 times the price listed above .
Note 2)
For reinforced concrete and steel frame structures, structural design is
handled by specialists.We will place the order with the office, so there
will be an additional charge separate from the above.Generally, reinforced
concrete or steel frame construction with a floor area of approximately
30 tsubo (approx. 100 square meters).It will cost approximately 500,000
yen excluding tax.
Note 3)
Flat 35 or other loans from the Japan Housing Finance Agency orIf you need
to apply for a loan from another lending institution,In addition to the
design and supervision fees mentioned above, we will charge an additional
200,000 yen (including tax).
Note 4)
Actual travel expenses will be required for project sites outside the five
prefectures (Osaka, Hyogo, Kyoto, Shiga, and Nara).
|
 |
|
 |
|
|
|
|